2015 Dec 5 (saturday)
matt and I arrived.
Plan (part 1)
- Install optics in the 5 remaining Telescope WFS
- Align Tel WFS in Tel S1
2015 Dec 6 (sunday)
- Mike and Theo arrived. will have group meeting later today to plan next few days.
- installed ANDOR software SOLIS on the UM laptop (ASUS)
- located all optics
- plan to setup test rig for aligning the lens tube telecentric re-imager
9:30pm.
We are going on sky.
- Discovery 1. M10 alignment shows some vignetting.
- Chris using combination of periscope + M10 to try to fix. But didn't work
- The whole game (mike, theo, chris) going to lab to figure this darn thing out and get rid of the vignetting. We don't want to start our engineering with a compromised beam!