2015 Dec CHARA AO Run JDM

From Monnier Group Research Wiki
Revision as of 23:21, 6 December 2015 by 141.213.172.40 (talk)
Jump to navigationJump to search

2015 Dec 5 (saturday)

matt and I arrived.

Plan (part 1)

  • Install optics in the 5 remaining Telescope WFS
  • Align Tel WFS in Tel S1



2015 Dec 6 (sunday)

  • installed ANDOR software SOLIS on the UM laptop (ASUS)
  • located all optics
  • plan to setup test rig for aligning the lens tube telescentric re-imager.