2015 Dec CHARA AO Run JDM
From Monnier Group Research Wiki
2015 Dec 5 (saturday)
matt and I arrived.
Plan (part 1)
- Install optics in the 5 remaining Telescope WFS
- Align Tel WFS in Tel S1
2015 Dec 6 (sunday)
- installed ANDOR software SOLIS on the UM laptop (ASUS)
- located all optics
- plan to setup test rig for aligning the lens tube telescentric re-imager.