Etalon Engineering Run 2014Jun

From Monnier Group Research Wiki
Revision as of 10:28, 16 June 2014 by 192.153.157.220 (talk) (Created page with " This CHARA run is for installing and testing the Etalon. John arrived on 2014Jun07 with the hardware.")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

This CHARA run is for installing and testing the Etalon.


John arrived on 2014Jun07 with the hardware.