Engineering 2011JanFeb

From Monnier Group Research Wiki
Revision as of 23:38, 25 January 2011 by Monnierast (talk | contribs)
Jump to navigationJump to search

Daily Log:

2011 January 25:

FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine. Tracking power failure for CHAMP mounts.