Schedule

From Monnier Group Research Wiki
Revision as of 08:20, 12 November 2010 by 99.36.123.64 (talk) (New page: 2010Nov: decide basic designs, form a big picture, degrees of freedom for each part, stages ,structure 2010Dec: take back part of mirc and photometric channels, start drawing solidworks ...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

2010Nov: decide basic designs, form a big picture, degrees of freedom for each part, stages ,structure

2010Dec: take back part of mirc and photometric channels, start drawing solidworks

2011Jan: continue drawing

2011Feb: buying material and products, such as rotational and linear stages. ask Scott making pieces

2011Mar: testing and remaking pieces

2011Apr: go to CHARA and install 6t mirc!