Engineering 2011JunJul

From Monnier Group Research Wiki
Revision as of 19:40, 4 July 2011 by Monnierast (talk | contribs) (New page: 28 June - 1 July FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been ...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

28 June - 1 July

FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP. Vacuum pumped + cooled CHAMP in prevision for the run.