Engineering 2011AprMay

From Monnier Group Research Wiki
Revision as of 00:36, 25 April 2011 by 192.153.157.220 (talk) (New page: ===Daily Log:=== ==2011 April 24:== Xiao filled the dewar before FB arrived, and pressure seems high (3e-6). After refilling both dewars, the pressure went down to 6e-7. All computers h...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Daily Log:

2011 April 24:

Xiao filled the dewar before FB arrived, and pressure seems high (3e-6). After refilling both dewars, the pressure went down to 6e-7.

All computers had to be rebooted due to a long power outage this night, including lothlorien, wolverine, zoot.

Did the alignment on beams 4, 5, 6 so as not to impede on CLIMB run (+ we need to measure the fringe position again now that the IR5 repeatability problem has been cleared).