Engineering 2011AprMay
From Monnier Group Research Wiki
Daily Log:
2011 April 24:
Xiao filled the dewar before FB arrived, and pressure seems high (3e-6). After refilling both dewars, the pressure went down to 6e-7.
All computers had to be rebooted due to a long power outage this night, including lothlorien, wolverine, zoot.
Did the alignment on beams 4, 5, 6 so as not to impede on CLIMB run (+ we need to measure the fringe position again now that the IR5 repeatability problem has been cleared).