2010jun jdm todo

From Monnier Group Research Wiki
Revision as of 21:30, 12 June 2010 by 192.153.157.220 (talk)
Jump to navigationJump to search

1. MIRC: Add button on mirc gui to send offsets to new server that theo made

Good progress on this by Xiao. put into shuttermatrix.

2. MIRC: Header: add information about POPS and the delay line cart actual positions

3. MIRC: UV data is not right -- I think the time is being sent wrong to the ople server in header.

4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood

5. MIRC: investigate mirc noise problem

not sure the problem. Xiao had a cool idea to improve fiber explorer spikes by using the mean level from other quadrants. and it worked!


6. CHAMP/MIRC: move wolverine to control room.decommission lothlorien [ship home?] [EP]

7. CHAMP install and test new dicroics with green laser [JDM]

8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves

9. CHAMP: plan alignment tools with Rafael

10. CHAMP: show full champ alignment to FB and RMG

11. MIRC: NEW FIBER explorer for 6T and PC [XC]

12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine