MIRC observing Run 2012Nov

From Monnier Group Research Wiki
Revision as of 18:44, 15 November 2012 by Monnier (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

JDM Notes

2012 Nov 14

Goals: align MIRC for 6T mode. get configuration setup.

Internal Fringes:

beam 4 ealing 10000
beam 5 ealing 90000
 
RETRO 3.2751 mm 


But fluxes are low: Beam 4 200cts Beam5 100 cts.