Engineering 2011JanFeb

From Monnier Group Research Wiki
Revision as of 17:46, 26 January 2011 by Monnierast (talk | contribs)
Jump to navigationJump to search

Daily Log:

2011 January 25:

FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine and updated the wiki instructions for CHAMP quickstart. Tracked power failure for CHAMP mounts to a disconnected cable on the MAXO box.

2011 January 26: