Engineering 2011JanFeb

From Monnier Group Research Wiki
Jump to navigationJump to search

Daily Log:

2011 January 25:

FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine. Tracked power failure for CHAMP mounts to a disconnected cable on the MAXO box.