2010jun jdm todo
1. MIRC: Add button on mirc gui to send offsets to new server that theo made
Good progress on this by Xiao. put into shuttermatrix.
2. MIRC: Header: add information about POPS and the delay line cart actual positions
3. MIRC: UV data is not right -- I think the time is being sent wrong to the ople server in header.
4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood
5. MIRC: investigate mirc noise problem
not sure the problem. Xiao had a cool idea to improve fiber explorer spikes by using the mean level from other quadrants. and it worked!
6. CHAMP/MIRC: move wolverine to control room.decommission lothlorien [ship home?] [EP]
7. CHAMP install and test new dicroics with green laser [JDM]
8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves
9. CHAMP: plan alignment tools with Rafael
10. CHAMP: show full champ alignment to FB and RMG
11. MIRC: NEW FIBER explorer for 6T and PC [XC]
12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine