2015 Dec CHARA AO Run JDM: Difference between revisions
From Monnier Group Research Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
2015 Dec 6 (sunday) | 2015 Dec 6 (sunday) | ||
*Mike and Theo arrived. will have group meeting later today to plan next few days. | |||
*installed ANDOR software SOLIS on the UM laptop (ASUS) | *installed ANDOR software SOLIS on the UM laptop (ASUS) | ||
*located all optics | *located all optics | ||
*plan to setup test rig for aligning the lens tube telescentric re-imager | *plan to setup test rig for aligning the lens tube telescentric re-imager |
Revision as of 23:22, 6 December 2015
2015 Dec 5 (saturday)
matt and I arrived.
Plan (part 1)
- Install optics in the 5 remaining Telescope WFS
- Align Tel WFS in Tel S1
2015 Dec 6 (sunday)
- Mike and Theo arrived. will have group meeting later today to plan next few days.
- installed ANDOR software SOLIS on the UM laptop (ASUS)
- located all optics
- plan to setup test rig for aligning the lens tube telescentric re-imager