2015 Dec CHARA AO Run JDM: Difference between revisions
From Monnier Group Research Wiki
Jump to navigationJump to search
Created page with " 2015 Dec 5 matt and I arrived. Plan" |
No edit summary |
||
Line 1: | Line 1: | ||
2015 Dec 5 (saturday) | |||
matt and I arrived. | |||
Plan (part 1) | |||
*Install optics in the 5 remaining Telescope WFS | |||
*Align Tel WFS in Tel S1 | |||
---- | |||
2015 Dec 6 (sunday) | |||
*installed ANDOR software SOLIS on the UM laptop (ASUS) | |||
*located all optics | |||
*plan to setup test rig for aligning the lens tube telescentric re-imager. |
Revision as of 23:21, 6 December 2015
2015 Dec 5 (saturday)
matt and I arrived.
Plan (part 1)
- Install optics in the 5 remaining Telescope WFS
- Align Tel WFS in Tel S1
2015 Dec 6 (sunday)
- installed ANDOR software SOLIS on the UM laptop (ASUS)
- located all optics
- plan to setup test rig for aligning the lens tube telescentric re-imager.