Etalon Engineering Run 2014Jun: Difference between revisions
From Monnier Group Research Wiki
Jump to navigationJump to search
Created page with " This CHARA run is for installing and testing the Etalon. John arrived on 2014Jun07 with the hardware." |
No edit summary |
||
Line 1: | Line 1: | ||
This CHARA run is for installing and testing the Etalon. | |||
by John Monnier | |||
I arrived on 2014Jun07 with the hardware. I discovered a small clearance issue -- the edge of the mount clipped V6. see image below | |||
[[File:etalon_clearance_problem.jpg]] |