== 2011 1 July ==


== 2011 28 June - 1 July ==
FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP.
Vacuum pumped CHAMP in prevision for the run, pressure ~5e-6.


FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP.
== 2011 2-3 July ==
Vacuum pumped + cooled CHAMP in prevision for the run.
 
FB: still working on the code, most of it compiles but still many issues.

Revision as of 19:44, 4 July 2011

2011 1 July

FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP. Vacuum pumped CHAMP in prevision for the run, pressure ~5e-6.

2011 2-3 July

FB: still working on the code, most of it compiles but still many issues.