Monnierast (talk | contribs) New page: 28 June - 1 July FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been ... |
Monnierast (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
28 June - 1 July | |||
== 2011 28 June - 1 July == | |||
FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP. | FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP. | ||
Vacuum pumped + cooled CHAMP in prevision for the run. | Vacuum pumped + cooled CHAMP in prevision for the run. |
Revision as of 19:41, 4 July 2011
2011 28 June - 1 July
FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP. Vacuum pumped + cooled CHAMP in prevision for the run.