2011MayJDMDailyLog: Difference between revisions
From Monnier Group Research Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
1. Wiki: | 1. Wiki: | ||
* Create jdm daily (this) | '''* Create jdm daily (this) | ||
* update global champ todo this | * update global champ todo this''' | ||
* update observing Logs for champ mirc | * update observing Logs for champ mirc | ||
2. align light source (luminos) for champ optimization | 2. align light source (luminos) for champ optimization | ||
'''3. check bootstrap6 code | |||
* done. fixed bug''' | |||
'''4. jdm stretch test (mirc GDT) | |||
* it works!!''' | |||
''' | |||
5. sabattical prep (send guy by monday morning) | 5. sabattical prep (send guy by monday morning) | ||
* done. sent guy draft''' | |||
6. bug hunt accumulation | 6. bug hunt accumulation | ||
* no luck.... possibly memory problem elsewhere in code. | |||
7. check fluxes for climb/champ | '''7. check fluxes for climb/champ | ||
* climb 2010Jul13. hd 192985. 500hz sampling. flux: 123/170/126 sum counts on B1,B2,B3. nz 4.0 cts | |||
* champ 2011May20 hd 192985. 500hz sampling. flux: ~120,120 sum counts on B3,B4. nz 3.3 cts.''' | |||
8. check npix_fringe >4 for wrap around and ft-PHI estimators. | '''8. check npix_fringe >4 for wrap around and ft-PHI estimators. | ||
* done. it works!''' | |||
9. ADD RT-TIME for MIRC/CHAMP and test with simultaneous lab fringes. | 9. ADD RT-TIME for MIRC/CHAMP and test with simultaneous lab fringes. | ||
10. find new opdmap based on on-sky data. | '''10. find new opdmap based on on-sky data. | ||
Sky wavelegnth was 1.045 X longer than the lab. | Sky wavelegnth was 1.045 X longer than the lab. | ||
assume lab was 2.15, then sky is 2.247. | |||
* did one beam so far. need to think about how to implement this generally.''' |
Revision as of 23:08, 23 May 2011
2011May21 Saturday
1. Wiki: * Create jdm daily (this)
- update global champ todo this
- update observing Logs for champ mirc
2. align light source (luminos) for champ optimization
3. check bootstrap6 code
- done. fixed bug
4. jdm stretch test (mirc GDT)
- it works!!
5. sabattical prep (send guy by monday morning)
- done. sent guy draft
6. bug hunt accumulation
- no luck.... possibly memory problem elsewhere in code.
7. check fluxes for climb/champ
- climb 2010Jul13. hd 192985. 500hz sampling. flux: 123/170/126 sum counts on B1,B2,B3. nz 4.0 cts
- champ 2011May20 hd 192985. 500hz sampling. flux: ~120,120 sum counts on B3,B4. nz 3.3 cts.
8. check npix_fringe >4 for wrap around and ft-PHI estimators.
- done. it works!
9. ADD RT-TIME for MIRC/CHAMP and test with simultaneous lab fringes.
10. find new opdmap based on on-sky data. Sky wavelegnth was 1.045 X longer than the lab. assume lab was 2.15, then sky is 2.247.
- did one beam so far. need to think about how to implement this generally.