Engineering 2011AprMay: Difference between revisions

From Monnier Group Research Wiki
Jump to navigationJump to search
Line 14: Line 14:
Started to work on shutter control with RMG, and on loading/saving config files from IRCam.  
Started to work on shutter control with RMG, and on loading/saving config files from IRCam.  
Also starting to review all possible issues when trying 6 beams, FT not ready, need to double check the bootstraping code too.
Also starting to review all possible issues when trying 6 beams, FT not ready, need to double check the bootstraping code too.
==2011 April 26:==
Reinstalled CHARA libraries properly. The code now compiles cleanly, everything is on CVS including CHAMP code.
Finished the addition of shutter code, working and compliant with CHARA code. RMG modified the alignment sequence for 6 beams.
Added the bootstrap for 6 beams (see CHAMP:Documents for the crazy equations...). Started to implement the wraparound carefully.

Revision as of 05:11, 27 April 2011

Daily Log:

2011 April 24:

Xiao filled the dewar before FB arrived, and pressure seems high (3e-6). After refilling both dewars, the pressure went down to 6e-7.

Did the alignment on beams 4, 5, 6 so as not to impede on CLIMB run (+ we need to measure the fringe position again now that the IR5 repeatability problem has been cleared).

All computers had to be rebooted due to a long power outage this night, including lothlorien, wolverine, zoot. Had to restart all servers (shutters, etc.). Green laser is completely disaligned, need to restart crtscrut again to launch server to use pico to realign it...

2011 April 25:

Full alignment with 6 beams done, may look for missing offset B1B6 this week. Started to work on shutter control with RMG, and on loading/saving config files from IRCam. Also starting to review all possible issues when trying 6 beams, FT not ready, need to double check the bootstraping code too.

2011 April 26:

Reinstalled CHARA libraries properly. The code now compiles cleanly, everything is on CVS including CHAMP code. Finished the addition of shutter code, working and compliant with CHARA code. RMG modified the alignment sequence for 6 beams. Added the bootstrap for 6 beams (see CHAMP:Documents for the crazy equations...). Started to implement the wraparound carefully.