Engineering 2011AprMay: Difference between revisions
From Monnier Group Research Wiki
Jump to navigationJump to search
New page: ===Daily Log:=== ==2011 April 24:== Xiao filled the dewar before FB arrived, and pressure seems high (3e-6). After refilling both dewars, the pressure went down to 6e-7. All computers h... |
|||
Line 5: | Line 5: | ||
Xiao filled the dewar before FB arrived, and pressure seems high (3e-6). After refilling both dewars, the pressure went down to 6e-7. | Xiao filled the dewar before FB arrived, and pressure seems high (3e-6). After refilling both dewars, the pressure went down to 6e-7. | ||
Did the alignment on beams 4, 5, 6 so as not to impede on CLIMB run (+ we need to measure the fringe position again now that the IR5 repeatability problem has been cleared). | |||
All computers had to be rebooted due to a long power outage this night, including lothlorien, wolverine, zoot. Had to restart all servers (shutters, etc.). |
Revision as of 00:41, 25 April 2011
Daily Log:
2011 April 24:
Xiao filled the dewar before FB arrived, and pressure seems high (3e-6). After refilling both dewars, the pressure went down to 6e-7.
Did the alignment on beams 4, 5, 6 so as not to impede on CLIMB run (+ we need to measure the fringe position again now that the IR5 repeatability problem has been cleared).
All computers had to be rebooted due to a long power outage this night, including lothlorien, wolverine, zoot. Had to restart all servers (shutters, etc.).