FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine. Tracking power failure for CHAMP mounts.
FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine. Tracked power failure for CHAMP mounts to a disconnected cable on the MAXO box.

Revision as of 01:50, 26 January 2011

Daily Log:

2011 January 25:

FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine. Tracked power failure for CHAMP mounts to a disconnected cable on the MAXO box.