Engineering 2011JanFeb: Difference between revisions
From Monnier Group Research Wiki
Jump to navigationJump to search
Monnierast (talk | contribs) No edit summary |
Monnierast (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
==2011 January 25:== | ==2011 January 25:== | ||
FB: began pumping on CHAMP. | FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine. Tracking power failure for CHAMP mounts. |
Revision as of 23:38, 25 January 2011
Daily Log:
2011 January 25:
FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine. Tracking power failure for CHAMP mounts.