Engineering 2011JanFeb: Difference between revisions

From Monnier Group Research Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 3: Line 3:
==2011 January 25:==
==2011 January 25:==


FB: began pumping on CHAMP.
FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine. Tracking power failure for CHAMP mounts.

Revision as of 23:38, 25 January 2011

Daily Log:

2011 January 25:

FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine. Tracking power failure for CHAMP mounts.