Engineering 2010Oct: Difference between revisions
Monnierast (talk | contribs) No edit summary |
Monnierast (talk | contribs) No edit summary |
||
Line 19: | Line 19: | ||
afternoon -- trying to debug the Zaber mount repeatability problem | afternoon -- trying to debug the Zaber mount repeatability problem | ||
==2010 October 5:== | |||
fb and sk | |||
morning -- redo alignment on E1S1; problems finding pyramid center (it helps to turn on the incandescent lights); fix problems with Zaber mount motors by increasing sleeptime from 3s to 10s | |||
afternoon -- small updates to champGui; searching for beams on wide-field image; 3-4 beams found but problems to align them | |||
evening -- redo alignment on W1W2; found internal WL fringes on R2 using W1-W2 (Beam 1-2) at +3.95mm (see image) | |||
[[Image:CHAMP.Fringe-W1W2-B1B2-R2.2010-10-05.jpg]] |
Revision as of 06:16, 6 October 2010
See last set of notes from Engineering 2010July-Aug
Daily Log:
2010 October 2:
fb: realigned champ optics and started working on fringe-jumping and coherent integration for cophasing.
2010 October 3:
fb: did a first alignment using the CCD but mostly worked on improving the software.
2010 October 4:
fb and sk
morning -- checking the alignment, CHAMP fully aligned at noon
afternoon -- trying to debug the Zaber mount repeatability problem
2010 October 5:
fb and sk
morning -- redo alignment on E1S1; problems finding pyramid center (it helps to turn on the incandescent lights); fix problems with Zaber mount motors by increasing sleeptime from 3s to 10s
afternoon -- small updates to champGui; searching for beams on wide-field image; 3-4 beams found but problems to align them
evening -- redo alignment on W1W2; found internal WL fringes on R2 using W1-W2 (Beam 1-2) at +3.95mm (see image)