Engineering 2011JunJul: Difference between revisions

From Monnier Group Research Wiki
Jump to navigationJump to search
New page: 28 June - 1 July FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been ...
 
No edit summary
Line 1: Line 1:
28 June - 1 July  
 
== 2011 28 June - 1 July ==


FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP.  
FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP.  
Vacuum pumped + cooled CHAMP in prevision for the run.
Vacuum pumped + cooled CHAMP in prevision for the run.

Revision as of 19:41, 4 July 2011

2011 28 June - 1 July

FB: mainly worked on integrating CHAMP with chara system, which requires solving some dependencies and conflicts. This is not an easy task as a lot of the code has been duplicated into files specific to CHAMP. Vacuum pumped + cooled CHAMP in prevision for the run.