2011MayJDMDailyLog: Difference between revisions
From Monnier Group Research Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
==2011May21 Saturday== | ==2011May21 Saturday== | ||
starting list. | |||
1. Wiki: | 1. Wiki: | ||
Line 33: | Line 34: | ||
assume lab was 2.15, then sky is 2.247. | assume lab was 2.15, then sky is 2.247. | ||
* did one beam so far. need to think about how to implement this generally.''' | * did one beam so far. need to think about how to implement this generally.''' | ||
==2011May23 Monday== | |||
high humidity today. likely good day to do some throughput alignment and focus tests. | |||
today's goals: | |||
* setup white light source | |||
* feed light into champ. check focus. Based on my notes L4R4 seem ok, L1R1 seemed bad. [but maybe poor alignment... careful!] | |||
* debug mirc fringe straightening code with xiao.test of b34 fringes | |||
* set RTIME on champ/mirc. and test using fringes! | |||
* fix champ/mirc delays with respect to chara system. |
Revision as of 23:12, 23 May 2011
2011May21 Saturday
starting list.
1. Wiki: * Create jdm daily (this)
- update global champ todo this
- update observing Logs for champ mirc
2. align light source (luminos) for champ optimization
3. check bootstrap6 code
- done. fixed bug
4. jdm stretch test (mirc GDT)
- it works!!
5. sabattical prep (send guy by monday morning)
- done. sent guy draft
6. bug hunt accumulation
- no luck.... possibly memory problem elsewhere in code.
7. check fluxes for climb/champ
- climb 2010Jul13. hd 192985. 500hz sampling. flux: 123/170/126 sum counts on B1,B2,B3. nz 4.0 cts
- champ 2011May20 hd 192985. 500hz sampling. flux: ~120,120 sum counts on B3,B4. nz 3.3 cts.
8. check npix_fringe >4 for wrap around and ft-PHI estimators.
- done. it works!
9. ADD RT-TIME for MIRC/CHAMP and test with simultaneous lab fringes.
10. find new opdmap based on on-sky data. Sky wavelegnth was 1.045 X longer than the lab. assume lab was 2.15, then sky is 2.247.
- did one beam so far. need to think about how to implement this generally.
2011May23 Monday
high humidity today. likely good day to do some throughput alignment and focus tests.
today's goals:
- setup white light source
- feed light into champ. check focus. Based on my notes L4R4 seem ok, L1R1 seemed bad. [but maybe poor alignment... careful!]
- debug mirc fringe straightening code with xiao.test of b34 fringes
- set RTIME on champ/mirc. and test using fringes!
- fix champ/mirc delays with respect to chara system.