Engineering 2011AprMay: Difference between revisions
Monnierast (talk | contribs) |
|||
Line 8: | Line 8: | ||
All computers had to be rebooted due to a long power outage this night, including lothlorien, wolverine, zoot. Had to restart all servers (shutters, etc.). Green laser is completely disaligned, need to restart crtscrut again to launch server to use pico to realign it... | All computers had to be rebooted due to a long power outage this night, including lothlorien, wolverine, zoot. Had to restart all servers (shutters, etc.). Green laser is completely disaligned, need to restart crtscrut again to launch server to use pico to realign it... | ||
==2011 April 25:== | |||
Full alignment with 6 beams done, may look for missing offset B1B6 this week. | |||
Started to work on shutter control with RMG, and on loading/saving config files from IRCam. | |||
Also starting to review all possible issues when trying 6 beams, FT not ready, need to double check the bootstraping code too. |
Revision as of 01:42, 26 April 2011
Daily Log:
2011 April 24:
Xiao filled the dewar before FB arrived, and pressure seems high (3e-6). After refilling both dewars, the pressure went down to 6e-7.
Did the alignment on beams 4, 5, 6 so as not to impede on CLIMB run (+ we need to measure the fringe position again now that the IR5 repeatability problem has been cleared).
All computers had to be rebooted due to a long power outage this night, including lothlorien, wolverine, zoot. Had to restart all servers (shutters, etc.). Green laser is completely disaligned, need to restart crtscrut again to launch server to use pico to realign it...
2011 April 25:
Full alignment with 6 beams done, may look for missing offset B1B6 this week. Started to work on shutter control with RMG, and on loading/saving config files from IRCam. Also starting to review all possible issues when trying 6 beams, FT not ready, need to double check the bootstraping code too.