Engineering 2011JanFeb: Difference between revisions

From Monnier Group Research Wiki
Jump to navigationJump to search
No edit summary
Line 4: Line 4:


FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine and updated the wiki instructions for CHAMP quickstart. Tracked power failure for CHAMP mounts to a disconnected cable on the MAXO box.
FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine and updated the wiki instructions for CHAMP quickstart. Tracked power failure for CHAMP mounts to a disconnected cable on the MAXO box.
==2011 January 26:==

Revision as of 17:46, 26 January 2011

Daily Log:

2011 January 25:

FB: began pumping on CHAMP. Set up plan with Rafael for the alignment tool. Restructured the CHAMP directory on wolverine and updated the wiki instructions for CHAMP quickstart. Tracked power failure for CHAMP mounts to a disconnected cable on the MAXO box.

2011 January 26: