2010julaug jdm todo: Difference between revisions
New page: (this list was moved from 2011jun_jdm_todo) '''1. MIRC: Add button on mirc gui to send offsets to new server that theo made Good progress on this by Xiao. put into shuttermatrix.''' ... |
No edit summary |
||
Line 1: | Line 1: | ||
(this list was moved from [[ | (this list was moved from [[2010jun_jdm_todo]]) | ||
'''1. MIRC: Add button on mirc gui to send offsets to new server that theo made | '''1. MIRC: Add button on mirc gui to send offsets to new server that theo made |
Revision as of 00:25, 26 July 2010
(this list was moved from 2010jun_jdm_todo)
1. MIRC: Add button on mirc gui to send offsets to new server that theo made
Good progress on this by Xiao. put into shuttermatrix.
2. MIRC: Header: add information about POPS and the delay line cart actual positions
3. MIRC: UV data is not right -- I think the time is being sent wrong to the ople server in header.
4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood
5. MIRC: investigate mirc noise problem
not sure the problem. Xiao had a cool idea to improve fiber explorer spikes by using the mean level from other quadrants. and it worked!
6a. CHAMP/MIRC: move wolverine to control room. [EP]
6b. Decommission lothlorien [ship home?]
Will not decommission lothlorien until after we run MIRC with wolverine.
7. CHAMP install and test new dicroics with green laser [JDM]
new dicroics have virtually ZERO wedge. we can see the green laser a bit better than red on first target, but still not easy.
8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves
9. CHAMP: plan alignment tools with Rafael
good progress here. Rafael has done alignment on table and with white light and has some feeling for the methods we want.
10. CHAMP: show full champ alignment to FB and RMG
done.
11. MIRC: NEW FIBER explorer for 6T and PC [XC]
Awesome job here !! Maybe not quite ready for 6T .
12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine
13. Tar backups and cvs/svn backups. 2010Jun_Backup_records
14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing.