Engineering 2010July-Aug: Difference between revisions
From Monnier Group Research Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
1. from scratch alignment of champ. preparation for picomotor tests at night. | 1. from scratch alignment of champ. preparation for picomotor tests at night. | ||
2. need to order new cable for ealing mounts (db9->rj45) | 2. need to order new cable for ealing mounts (db9->rj45) | ||
3. | 3. measured asymmetry in picomotor motions for dicroics [not for tower of power yet] | ||
4. ordered ealing cable for champ dicroic | |||
5. got 100x100 readout working for champ | |||
6. tested baseline button for mirc -- worked in lab but seemed to fail on sky | |||
7. fringes with mirc! | |||
----- | ----- |
Revision as of 09:48, 4 August 2010
See last set of notes from Engineering 2010May-June
Daily Log:
2010 August 3:
1. from scratch alignment of champ. preparation for picomotor tests at night. 2. need to order new cable for ealing mounts (db9->rj45) 3. measured asymmetry in picomotor motions for dicroics [not for tower of power yet] 4. ordered ealing cable for champ dicroic 5. got 100x100 readout working for champ 6. tested baseline button for mirc -- worked in lab but seemed to fail on sky 7. fringes with mirc!
Ettore Pedretti came out for 2 weeks to work on upgrade xenomai on mirc/champ
Xiao Che came for 3 weeks to lead the MIRC observing and do some small MIRC improvements
work finished and needs to be done
Fabien Baron came for 4+ weeks to observe with CLIMB/CLASSIC and to work on CHAMP engineering
Stefan Kraus came out for 2+ weeks to help with CHAMP
Rafael Millan-Gabet came up for XX nights to help with CHAMP engineering
JDM came out for 3 weeks to help with champ commissioning (4 telescope operation!)