CHAMP:Engineering Measurements: Difference between revisions

From Monnier Group Research Wiki
Jump to navigationJump to search
No edit summary
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
==CHAMP-MIRC offsets==
==CHAMP-MIRC offsets==


2010-09-07a: We found fringes with MIRC putting the Ealing-mount IR4s to 90615)
MIRC-IR1=40350


2010-09-07b: We put the MIRC Ealing mounts to good position and adjust Newport RETRO mounts to find fringes on MIRC.  Then, we search with Dichroics to find fringes on CHAMP:
MIRC-IR2=80449


IR1: -
MIRC-IR3=66000


IR2: -
MIRC-IR4=80000


IR3: -
CHAMP-IR1=???


IR4: 181750 (Beam 3/4)
CHAMP-IR2=75000 (determined on 2010Oct08)
 
CHAMP-IR3=81600 (determined on 2010Oct08)
 
CHAMP-IR4=109300 (determined on 2010Oct08)


==Bad Pixel Maps==
==Bad Pixel Maps==

Latest revision as of 12:33, 9 October 2010

CHAMP-MIRC offsets[edit]

MIRC-IR1=40350

MIRC-IR2=80449

MIRC-IR3=66000

MIRC-IR4=80000

CHAMP-IR1=???

CHAMP-IR2=75000 (determined on 2010Oct08)

CHAMP-IR3=81600 (determined on 2010Oct08)

CHAMP-IR4=109300 (determined on 2010Oct08)

Bad Pixel Maps[edit]

2010-09-07:


Old: