2010julaug jdm todo: Difference between revisions

From Monnier Group Research Wiki
Jump to navigationJump to search
Monnier (talk | contribs)
No edit summary
 
(5 intermediate revisions by one other user not shown)
Line 1: Line 1:
(this list was moved from [[2010jun_jdm_todo]])
(this list was moved from [[2010jun_jdm_todo]])
==Shopping List==
1. replacement knob for newport tilt on beam 1.
'''2. rj45 - db9 cable for champ ealing mounts [ordered NextWarehouse: CBL-RJ45M9-150]'''
3. ups for mirc
4. new 2" zabar motor for prism.
----------


'''1. MIRC: Add button on mirc gui to send offsets to new server that theo made
'''1. MIRC: Add button on mirc gui to send offsets to new server that theo made


Good progress on this by Xiao. put into shuttermatrix.'''
Good progress on this by Xiao. put into shuttermatrix.'''
(update 2010Aug03):  It Works!!  [wait: maybe still not working on sky]


2. MIRC: Header: add information about POPS and the delay line cart actual positions
2. MIRC: Header: add information about POPS and the delay line cart actual positions
Line 10: Line 29:


4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood
4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood
12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine
13. Tar backups and cvs/svn backups.
[[2010Jun_Backup_records]]
14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing.
Done


'''5. MIRC: investigate mirc noise problem
'''5. MIRC: investigate mirc noise problem
Line 39: Line 71:


Awesome job here !!  Maybe not quite ready for 6T . '''
Awesome job here !!  Maybe not quite ready for 6T . '''
12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine
13. Tar backups and cvs/svn backups.
[[2010Jun_Backup_records]]
14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing.

Latest revision as of 17:44, 7 August 2010

(this list was moved from 2010jun_jdm_todo)


Shopping List[edit]

1. replacement knob for newport tilt on beam 1.

2. rj45 - db9 cable for champ ealing mounts [ordered NextWarehouse: CBL-RJ45M9-150]

3. ups for mirc

4. new 2" zabar motor for prism.




1. MIRC: Add button on mirc gui to send offsets to new server that theo made

Good progress on this by Xiao. put into shuttermatrix.

(update 2010Aug03): It Works!! [wait: maybe still not working on sky]


2. MIRC: Header: add information about POPS and the delay line cart actual positions

3. MIRC: UV data is not right -- I think the time is being sent wrong to the ople server in header.

4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood


12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine

13. Tar backups and cvs/svn backups. 2010Jun_Backup_records

14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing.


Done


5. MIRC: investigate mirc noise problem

not sure the problem. Xiao had a cool idea to improve fiber explorer spikes by using the mean level from other quadrants. and it worked!


6a. CHAMP/MIRC: move wolverine to control room. [EP]

6b. Decommission lothlorien [ship home?]

Will not decommission lothlorien until after we run MIRC with wolverine.

7. CHAMP install and test new dicroics with green laser [JDM]

new dicroics have virtually ZERO wedge. we can see the green laser a bit better than red on first target, but still not easy.

8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves

9. CHAMP: plan alignment tools with Rafael

good progress here. Rafael has done alignment on table and with white light and has some feeling for the methods we want.

10. CHAMP: show full champ alignment to FB and RMG

done.

11. MIRC: NEW FIBER explorer for 6T and PC [XC]

Awesome job here !! Maybe not quite ready for 6T .