2010julaug jdm todo: Difference between revisions
No edit summary |
No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 5: | Line 5: | ||
1. replacement knob for newport tilt on beam 1. | 1. replacement knob for newport tilt on beam 1. | ||
2. rj45 - db9 cable for champ ealing mounts | '''2. rj45 - db9 cable for champ ealing mounts [ordered NextWarehouse: CBL-RJ45M9-150]''' | ||
3. ups for mirc | 3. ups for mirc | ||
4. new 2" zabar motor for prism. | |||
---------- | ---------- | ||
Line 15: | Line 20: | ||
Good progress on this by Xiao. put into shuttermatrix.''' | Good progress on this by Xiao. put into shuttermatrix.''' | ||
(update 2010Aug03): It Works!! | |||
(update 2010Aug03): It Works!! [wait: maybe still not working on sky] | |||
Line 31: | Line 37: | ||
14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing. | 14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing. | ||
Latest revision as of 17:44, 7 August 2010
(this list was moved from 2010jun_jdm_todo)
Shopping List[edit]
1. replacement knob for newport tilt on beam 1.
2. rj45 - db9 cable for champ ealing mounts [ordered NextWarehouse: CBL-RJ45M9-150]
3. ups for mirc
4. new 2" zabar motor for prism.
1. MIRC: Add button on mirc gui to send offsets to new server that theo made
Good progress on this by Xiao. put into shuttermatrix.
(update 2010Aug03): It Works!! [wait: maybe still not working on sky]
2. MIRC: Header: add information about POPS and the delay line cart actual positions
3. MIRC: UV data is not right -- I think the time is being sent wrong to the ople server in header.
4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood
12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine
13. Tar backups and cvs/svn backups. 2010Jun_Backup_records
14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing.
Done
5. MIRC: investigate mirc noise problem
not sure the problem. Xiao had a cool idea to improve fiber explorer spikes by using the mean level from other quadrants. and it worked!
6a. CHAMP/MIRC: move wolverine to control room. [EP]
6b. Decommission lothlorien [ship home?]
Will not decommission lothlorien until after we run MIRC with wolverine.
7. CHAMP install and test new dicroics with green laser [JDM]
new dicroics have virtually ZERO wedge. we can see the green laser a bit better than red on first target, but still not easy.
8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves
9. CHAMP: plan alignment tools with Rafael
good progress here. Rafael has done alignment on table and with white light and has some feeling for the methods we want.
10. CHAMP: show full champ alignment to FB and RMG
done.
11. MIRC: NEW FIBER explorer for 6T and PC [XC]
Awesome job here !! Maybe not quite ready for 6T .