2010jun jdm todo: Difference between revisions

From Monnier Group Research Wiki
Jump to navigationJump to search
Monnier (talk | contribs)
No edit summary
Monnier (talk | contribs)
No edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
1. MIRC: Add button on mirc gui to send offsets to new server that theo made
'''1. MIRC: Add button on mirc gui to send offsets to new server that theo made
 
Good progress on this by Xiao. put into shuttermatrix.'''


2. MIRC: Header: add information about POPS and the delay line cart actual positions
2. MIRC: Header: add information about POPS and the delay line cart actual positions
Line 7: Line 9:
4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood
4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood


5. MIRC: investigate mirc noise problem
'''5. MIRC: investigate mirc noise problem
 
not sure the problem. Xiao had a cool idea to improve fiber explorer spikes by using the mean level from other quadrants. and it worked!'''
 
 
'''6a. CHAMP/MIRC: move wolverine to control room. [EP] '''
 
'''6b. Decommission lothlorien [ship home?]
 
Will not decommission lothlorien until after we run MIRC with wolverine.'''
 
'''7. CHAMP install and test new dicroics with green laser [JDM]
new dicroics have virtually ZERO wedge. we can see the green laser a bit better than red on first target, but still not easy.'''
 
'''8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves'''
 
'''9. CHAMP: plan alignment tools with Rafael
 
good progress here. Rafael has done alignment on table and with white light and has some feeling for the methods we want.'''
 
'''10. CHAMP: show full champ alignment to FB and RMG
 
done.'''


6. CHAMP/MIRC: '''move wolverine to control room.'''decommission lothlorien [ship home?] [EP]
'''11. MIRC: NEW FIBER explorer for 6T and PC [XC]


'''7. CHAMP install and test new dicroics with green laser [JDM]"'''
Awesome job here !!  Maybe not quite ready for 6T . '''
"8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves'''


9. CHAMP: plan alignment tools with Rafael
12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine


10. CHAMP: show full champ alignment to FB and RMG
13. Tar backups and cvs/svn backups.
[[2010Jun_Backup_records]]


'''11. MIRC: NEW FIBER explorer for 6T and PC [XC]'''
14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing.

Latest revision as of 22:03, 12 June 2010

1. MIRC: Add button on mirc gui to send offsets to new server that theo made

Good progress on this by Xiao. put into shuttermatrix.

2. MIRC: Header: add information about POPS and the delay line cart actual positions

3. MIRC: UV data is not right -- I think the time is being sent wrong to the ople server in header.

4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood

5. MIRC: investigate mirc noise problem

not sure the problem. Xiao had a cool idea to improve fiber explorer spikes by using the mean level from other quadrants. and it worked!


6a. CHAMP/MIRC: move wolverine to control room. [EP]

6b. Decommission lothlorien [ship home?]

Will not decommission lothlorien until after we run MIRC with wolverine.

7. CHAMP install and test new dicroics with green laser [JDM]

new dicroics have virtually ZERO wedge. we can see the green laser a bit better than red on first target, but still not easy.

8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves

9. CHAMP: plan alignment tools with Rafael

good progress here. Rafael has done alignment on table and with white light and has some feeling for the methods we want.

10. CHAMP: show full champ alignment to FB and RMG

done.

11. MIRC: NEW FIBER explorer for 6T and PC [XC]

Awesome job here !! Maybe not quite ready for 6T .

12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine

13. Tar backups and cvs/svn backups. 2010Jun_Backup_records

14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing.