New page: 1. MIRC: Add button on mirc gui to send offsets to new server that theo made 2. MIRC: Header: add information about POPS and the delay line cart actual positions 3. MIRC: UV data is not ... |
No edit summary |
||
(8 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
'''1. MIRC: Add button on mirc gui to send offsets to new server that theo made | |||
Good progress on this by Xiao. put into shuttermatrix.''' | |||
2. MIRC: Header: add information about POPS and the delay line cart actual positions | 2. MIRC: Header: add information about POPS and the delay line cart actual positions | ||
3. MIRC: UV data is not right -- I think the time is being sent wrong to the ople server in header. | 3. MIRC: UV data is not right -- I think the time is being sent wrong to the ople server in header. | ||
4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood | 4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood | ||
5. MIRC: investigate mirc noise problem | |||
'''5. MIRC: investigate mirc noise problem | |||
not sure the problem. Xiao had a cool idea to improve fiber explorer spikes by using the mean level from other quadrants. and it worked!''' | |||
9. CHAMP: plan alignment tools with Rafael | |||
10. CHAMP: show full champ alignment to FB and RMG | |||
'''6a. CHAMP/MIRC: move wolverine to control room. [EP] ''' | |||
'''6b. Decommission lothlorien [ship home?] | |||
Will not decommission lothlorien until after we run MIRC with wolverine.''' | |||
'''7. CHAMP install and test new dicroics with green laser [JDM] | |||
new dicroics have virtually ZERO wedge. we can see the green laser a bit better than red on first target, but still not easy.''' | |||
'''8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves''' | |||
'''9. CHAMP: plan alignment tools with Rafael | |||
good progress here. Rafael has done alignment on table and with white light and has some feeling for the methods we want.''' | |||
'''10. CHAMP: show full champ alignment to FB and RMG | |||
done.''' | |||
'''11. MIRC: NEW FIBER explorer for 6T and PC [XC] | |||
Awesome job here !! Maybe not quite ready for 6T . ''' | |||
12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine | |||
13. Tar backups and cvs/svn backups. | |||
[[2010Jun_Backup_records]] | |||
14. Add fits converter on mirkwood to slowly (in background) carryout level 1 data reduction on .fits files to averaged files of smaller size to make it possible to do realtime or next day processing. |
Latest revision as of 22:03, 12 June 2010
1. MIRC: Add button on mirc gui to send offsets to new server that theo made
Good progress on this by Xiao. put into shuttermatrix.
2. MIRC: Header: add information about POPS and the delay line cart actual positions
3. MIRC: UV data is not right -- I think the time is being sent wrong to the ople server in header.
4. MIRC: Update chara_messages.h (64bit/32biytZ) and save to CVS!!! and install in intall directory on mirkwood
5. MIRC: investigate mirc noise problem
not sure the problem. Xiao had a cool idea to improve fiber explorer spikes by using the mean level from other quadrants. and it worked!
6a. CHAMP/MIRC: move wolverine to control room. [EP]
6b. Decommission lothlorien [ship home?]
Will not decommission lothlorien until after we run MIRC with wolverine.
7. CHAMP install and test new dicroics with green laser [JDM]
new dicroics have virtually ZERO wedge. we can see the green laser a bit better than red on first target, but still not easy.
8. CHAMP/MIRC: discuss update path for mirc and chara OS with ettore before he leaves
9. CHAMP: plan alignment tools with Rafael
good progress here. Rafael has done alignment on table and with white light and has some feeling for the methods we want.
10. CHAMP: show full champ alignment to FB and RMG
done.
11. MIRC: NEW FIBER explorer for 6T and PC [XC]
Awesome job here !! Maybe not quite ready for 6T .
12. MIRC: figure out how to do edits and cvs for old mirc since we have moved to wolverine
13. Tar backups and cvs/svn backups. 2010Jun_Backup_records